T & C
- Upgradation of road from Chendang Saddle to Noklak (Phase-I)
- Construction of 55 M Steel Bridge over River Kateng Kali Kho
- Upgradation, Carpeting and Construction of new road from Tha
- Construction of RCC Bridge No. 17-1 over river Dhansiri on U
- Wokha-MerapaniRoad (60.58Kms)
- Dari Chambang
- Lanka to Umrangso via Diyungmukh, Haflong Tinali and Panimur
- Lawngtlai to Tuipui Ferry Road
- Likabali Township road (L-10 km) Lower Siang District
- Margherita-Deomali Road
- Mawsmai-Shella
- Naga Lempong- Ahom Cave trekking point, Longleng
- Pokriang SDO HQ
- RCC Bridge over river Aie at Aie Powali, Chirang District(L-
- Amarpur (Fatiksagar)- Chabimura
- Rehabilitation and Upgradation of Kamjong to Kongkhan Thana
Pages
- Wokha-MerapaniRoad (60.58Kms)
- Upgradation, Carpeting and Construction of new road from Tharpu to Saili Golai for diversion of Boject Slide in West Sikkim
- Upgradation of road from Chendang Saddle to Noklak (Phase-I)
- Upgradation of 9th Mile(on East West Corridor in Assam) to Umsen via Killing Pilangkata Road
- Terung- Sumsipathar,Tirap
- Road over Bridge at Jorhat in replacement of Railway LC gate No ST-58 on Na-Ali, Jorhat. (Br.803.189M)
- Rigid Pavements road,Tawang
- Rehabilitation and Upgradation of Kamjong to Kongkhan Thana via Pilong
- RCC Bridge over river Aie at Aie Powali, Chirang District(L- 3.4 KM Br L-600 M)
- Pokriang SDO HQ
- Naga Lempong- Ahom Cave trekking point, Longleng
- Mawsmai-Shella
- Margherita-Deomali Road
- Likabali Township road (L-10 km) Lower Siang District
- Lawngtlai to Tuipui Ferry Road
- Lanka to Umrangso via Diyungmukh, Haflong Tinali and Panimur (L-68.915KM Br L-1x5M & 3x12.5M)